Your certification body inspects you, decides your certification, issues every certificate your buyers rely on — and can suspend all of it. Choosing badly is expensive in a way that shows up a year later.
The short version
- Check the accreditation category, not just "NPOP accredited".
- You are owed documents: the standards, the procedures, and your inspection reports.
- Transaction certificates have deadlines: 5, 3 or 7 working days once documents are complete.
- Ask about appeals before you sign, while it is cheap to ask.
Accreditation Is Category-Specific
A body accredited for crop production cannot certify your processing unit unless it also holds that category.
A company that grows, processes and exports needs its whole chain covered — by one body across all of it, or by more than one, with the joins understood before the season starts.
What the Body Must Be
NPOP binds certification bodies to impartiality, independence and freedom from conflict of interest.
Impartial and independent
A condition of holding accreditation, not an aspiration.
No conflict of interest
A body that consults for you on the standard it audits you against is exactly the conflict the rules prevent.
Confidential and accountable
With a quality management system and competent staff.
What the Body Owes You
The standards, the procedures, a valid contract and certificate, and copies of your inspection reports.
- At applicationAn up-to-date copy of the National Standards, and a description of the inspection, certification and appeals procedure.
- As an existing operatorNotice of any changes to the standards and procedures.
- ThroughoutA valid contract, and a valid certificate showing your certified products.
- After every inspectionThe right to copies of the inspection report and related documents.
Deadlines You Can Hold Them To
Once your documents are complete, transaction certificates are due within 5, 3 or 7 working days.
The clock runs from complete documents, and stops where risk analysis calls for physical verification. Upstream certificates from another certification body must be verified first.
Work out a due date from your own submission date:
This interactive tool needs JavaScript. The rules it applies are set out in the text of this episode.
Questions to Ask Before You Sign
Five questions. Tick them off as you ask — your progress is saved.
Ask these before you sign
- Which categories are you accredited for — does that cover my farms, unit and trade?
- Who will inspect me, and do they know my crop or process?
- What does the fee cover: inspection, certificates, TCs, sampling, lab analysis?
- What is your transaction certificate turnaround in peak season?
- How do you handle an appeal against your own decision?
Check yourself
Tap an answer to see whether you are right, and why.
A body says it is "NPOP accredited". Is that enough?
- Yes
- No — it must be accredited for your category
- Only for traders
Accreditation is category by category. Confirm it covers every category in your chain.
How long should an export transaction certificate take once documents are complete?
- 3 working days
- 7 working days
- 30 days
7 working days for export TCs, unless physical verification is required.
Remember these things
- Check the category, not just the accreditation.
- You are entitled to standards, procedures and your inspection reports.
- Export TCs: 7 working days from complete documents.
See also NPOP certificate issuance. KrushiFlow validates these fields and submits farmer records to the portal in bulk. Back to the series map.