Most delays in PGS-India certification come from a deadline someone didn't know about. Chapter 6 of the official guidelines lists them, and a few more sit elsewhere in the document. Here they all are, in one place, sourced rather than guessed.

The ones that bite most often

  • 7 daysBefore harvest — last day to upload the peer appraisal summary sheet
  • 60 daysAfter harvest — last day to upload actual yields
  • 30 daysRC's limit to decide on certification, or the group's decision is auto-approved
  • 12 monthsWithout a summary sheet and the group is suspended

Local Group Deadlines

WhatDeadline
Peer appraisal windowDuring the crop growth period — from 15 days after sowing to 15 days before harvest
Plantation cropsTwo peer appraisals — one during flowering, another six months later
Peer appraisal summary sheet uploadNo later than 7 days before the harvest date
Actual yield uploadWithin 60 days of harvest
First trainingWithin 6 months of registration; at least one training a year
Group meetingsFour a year, at least two each season (§6.1.1); §4.2 sets 2 a year for perennial-crop groups and 4 for annual-crop groups
Resubmission after RC returns a decisionWithin 15 days
Holding stockWithin the validity of the scope certificate
Unsold stock with no TCs issuedDeleted automatically by the website 12 months after the harvest date
Continuous non-submission of summary sheetsTwo seasons or 12 months → group suspended; revival restarts at PGS-Green-1
🥬

Perishables work on a shorter cycle. Livestock products, vegetables and fruits may be traded daily or weekly at the group's discretion, with yields uploaded weekly or fortnightly and TCs issued in batch mode on the same weekly or fortnightly basis.

Regional Council Deadlines

WhatDeadline
Accept a Local Group, individual farmer or processor applicationWithin 30 days of submission
First inspection and endorsement, when a group asks the RC to endorse itWithin 60 days, then grant registration
Approve a certification decisionWithin 30 days of the summary sheet — or 15 days on resubmission after a return
Certify an individual farmer or processorWithin 30 days of physical inspection
Approve actual yieldsWithin 15 days of the group uploading them
Physical inspection of Local GroupsWithin 12 months the first time, then at least once every 24 months — and at least 50% of groups each year
Physical inspection of individual farmers and processing unitsAt least once a year
Approve a processor's annual system planWithin 15 days of submission
⏱️

The 30-day certification limit has teeth: if the RC doesn't endorse or otherwise act on the group's decision within 30 days, the decision is auto-approved on the PGS-India website and a non-compliance is recorded against the RC.

Zonal Council Deadlines

WhatDeadline
Monitor and physically evaluate each RCAt least once in 12 months
Annual report on RCsOnce a year, in January–February, covering January to December
Decide a Local Group's appeal against certification denialWithin 30 days of the appeal
Investigate a complaint and report to the SecretariatWithin 60 days of receiving it

Validity and Appeals

For how these deadlines fit into the certification sequence itself, see the certification process.