Episode 6 of 9Chapter 3 · Rules & Enforcement
ForLocal Groups, Regional Councils and Zonal CouncilsLevelBeginner

Most delays in PGS-India certification come from a deadline someone did not know about. Chapter 6 of the guidelines lists them, and a few more sit elsewhere in the document. This episode collects every deadline for Local Groups, Regional Councils and Zonal Councils in one place.

The short version

  1. Summary sheet: at least 7 days before harvest.
  2. Actual yields: within 60 days of harvest.
  3. The RC decides within 30 days, or the decision is auto-approved.
  4. No summary sheet for 12 months: the group is suspended.
Test yourself

Local Group Deadlines

Appraisal window, summary sheet, yields, training, meetings, resubmission and stock rules for groups.

WhatDeadline
Peer appraisal windowDuring the crop growth period — from 15 days after sowing to 15 days before harvest
Plantation cropsTwo peer appraisals — one during flowering, another six months later
Peer appraisal summary sheet uploadNo later than 7 days before the harvest date
Actual yield uploadWithin 60 days of harvest
First trainingWithin 6 months of registration; at least one training a year
Group meetingsFour a year, at least two each season (§6.1.1); §4.2 sets 2 a year for perennial-crop groups and 4 for annual-crop groups
Resubmission after RC returns a decisionWithin 15 days
Holding stockWithin the validity of the scope certificate
Unsold stock with no TCs issuedDeleted automatically by the website 12 months after the harvest date
Continuous non-submission of summary sheetsTwo seasons or 12 months → group suspended; revival restarts at PGS-Green-1

Perishables work on a shorter cycle. Livestock products, vegetables and fruits may be traded daily or weekly at the group's discretion, with yields uploaded weekly or fortnightly and TCs issued in batch mode on the same weekly or fortnightly basis.

Regional Council Deadlines

Acceptance, endorsement, decisions, yield approval, inspections and processor plans for RCs.

WhatDeadline
Accept a Local Group, individual farmer or processor applicationWithin 30 days of submission
First inspection and endorsement, when a group asks the RC to endorse itWithin 60 days, then grant registration
Approve a certification decisionWithin 30 days of the summary sheet — or 15 days on resubmission after a return
Certify an individual farmer or processorWithin 30 days of physical inspection
Approve actual yieldsWithin 15 days of the group uploading them
Physical inspection of Local GroupsWithin 12 months the first time, then at least once every 24 months — and at least 50% of groups each year
Physical inspection of individual farmers and processing unitsAt least once a year
Approve a processor's annual system planWithin 15 days of submission

The 30-day certification limit has teeth: if the RC doesn't endorse or otherwise act on the group's decision within 30 days, the decision is auto-approved on the PGS-India website and a non-compliance is recorded against the RC.

Zonal Council Deadlines

RC evaluation, the annual report, appeals and complaints for Zonal Councils.

WhatDeadline
Monitor and physically evaluate each RCAt least once in 12 months
Annual report on RCsOnce a year, in January–February, covering January to December
Decide a Local Group's appeal against certification denialWithin 30 days of the appeal
Investigate a complaint and report to the SecretariatWithin 60 days of receiving it

Validity and Appeals

Scope certificates last 12 months from RC approval; appeals are decided in 30 days, or 90 with investigation.

For how these deadlines fit into the certification sequence itself, see the certification process.

Check yourself

Tap an answer to see whether you are right, and why.

By when must actual yields be uploaded?

  1. 7 days before harvest
  2. Within 60 days of harvest
  3. Within 12 months

The RC then approves within 15 days.

How often must a Zonal Council evaluate each RC?

  1. Every 3 years
  2. At least once in 12 months
  3. Only after complaints

It also reports on RCs every January to February.

Remember these things

  • 7 days before harvest: summary sheet.
  • 60 days after harvest: yields.
  • 30 days: the RC's decision.
  • 12 months of silence: suspension.

A calendar built from these deadlines prevents most certification delays. KrushiFlow validates these fields and submits farmer records to the portal in bulk.

Up next · Episode 7PGS-India Appeals: How to Challenge a Certification Decision
Continue